The Project consists of fabrication and installation of corn inventory hoppers 1 & 2 , corn continuous cooker for line 2 , installation of pre cooked corn washers for line 2 , three corn steeping stainless Steel tanks, Steel structures for corn grinder for line 2 , corn flour cooling equipment for line 2 , precarp full separation system for lines 1 and 2, modification the SS tower of precarp system .

Modification, equipment change and arrangement of the packing tower of the bulk system and 1 kilo bag were also carried out, enabled, manufacturing and installation of mezzanine based on metallic structure in warehouse of spare parts in plant, assembly of 2 silos for flour inside the plant, including foundations, parking roof for employees on the floor. slope plating in access to plant 1350 m2, paving with hydraulic concrete in access to plant 650 m2, supply and assembly of three-phase disconnecting equipment of 600 amp type AL-DUTY in plant power supply line.

© 2020 actualizado por SIRSA. 

  • Facebook - Grey Circle
  • Google+ - Grey Circle
bottom of page