The project was developed as follows: Dismantling of 4 ”pneumatic stainless steel lines to transport the of nixtamal  for units 1 and 3, assembly of equipment, 3-way pneumatic valve to transport of nixtamal units 1 and 3, 18 m multipanel tower modification. height to reduce it to 13.5 m. of height, removal of screw conveyors and peripheral equipment for the modification of the pneumatic transport system of nixtamal, withdrawal of 32 ml. 10 ”carbon steel pipe for drainage of steeping silos, design, and logistics to perform maneuver by changing equipment in bulk packing tower line 2, 15 m3 hopper removal. by change of equipment, increase of 6 m. height in existing IPR metal tower and lined and sealed through existing roof with multipanel to accommodate new equipment.

The construction of customized structural work for sinks and access control to the 15 m2 process area was also carried out. for 3.5 m high, with the installation of water and water dispensers, projection of maneuvers and catalog of concepts for the modification of the nixtamal transport system of unit 2, Construction of structural works and assembly of 2 bolted silos for flour in CST brand plant; engineering development and commissioning of double cyclone arrangement in cooling system in unit 3 of production and repair with hydraulic concrete of general access to the plant.

© 2020 actualizado por SIRSA. 

  • Facebook - Grey Circle
  • Google+ - Grey Circle
bottom of page