top of page

GUANAJUATO

The project consisted of the engineering, site preparation for interior  pavement, engineering and development and construction of an anchorage system for an elevated tank, a 15 m bolted tank installation. high and 8.40 m. in diameter, for water storage, construction of the pump room, pump bases, and electrical installation, electrical conduit formwork on roads, installation of land system and construction of bases for pipe support.

© 2020 actualizado por SIRSA. 

  • Facebook - Grey Circle
  • Google+ - Grey Circle
bottom of page